Investing to energy production is one of the main results of Habas Group’ s principle of “ Maintaining and strengthening the competition superiority in the future”.
After start up of the 54 MW cogeneration power plant in 2002, the 240 MW combined cycle power plant was put to operation in 2004. Lastly, 800 MW combined cycle power plant was added to operate in 2018.
Having total 1100 MW power generating capacity, Habaş is one of the outstanding electricity provider for the domestic market.
Habaş has aimed to grow further in the energy market with new power plant investments.